Pond Extension

A 6 days construction on site, with no welding, no concrete mess. All the elements are digitally fabricated following our UBIC system. Instead of a large concrete closed slab in front of the House's entrance, a lightweight, removable but durable intervention, with a spirit. From Corten steel and wood, with gorgeous tectonic details. The pond was extended by 6.5m3, the area covered from leaves and sun rays.

Pond Extension

Pond Extension

Pond Extension

Pond Extension

Pond Extension

Media Gallery Picture
Loading
Stay up to date
Subscribe to our newsletter for our latest news lorem Ipsum is simply for our latest news lorem Ipsum is simply.